- Home
- About Us
- Solutions
- Projects
- Media Centre
- Contact Us
- The Aveng Group
The project was initiated in October 2008 and is designed to treat 15,000m3/day with a peak capacity of 18,500m3/day. this plant treats water with a 99% water recovery, most of which is utilised by the local Hendrina municipality, with the excess being discharged into the Klein Olifants river. Pure gypsum sludge from this plant is also available for sale as a building material.
The design of this facility differs from the emalahleni plant in that the upfront neutralisation reactors are not included. The plant is operated and maintained by aveng water and is anticipated to be functional beyond the life of the mine.